The Hudson Board of Selectmen unanimously approved up to $75,000 for improvements at Hills Memorial Library during its most recent meeting. The proposed work includes basement flooring, heating and cooling upgrades, electrical improvements, and repairs to address drainage and water intrusion.

Development Services Director Elvis Dhima explained that following an earlier presentation, the Board had authorized further evaluation of improvements to the library and potential funding sources.

“Following a presentation by the Town Administrator, the Board of Selectmen authorized further evaluation of improvements to Hills Memorial Library and potential funding sources,” Dhima explained. “Staff has since obtained contractor quotes and reviewed the work needed to improve the basement floors, upgrade the heating and cooling systems, and address water intrusion in the basement. For the basement flooring, the Town received a quote from Elite Epoxy Flooring, the contractor that recently completed the flooring improvements at Central Fire Station. The proposed work includes preparing the existing concrete, repairing surface imperfections, and installing a new floor coating.”

For the heating and cooling improvements, the Town received four quotes, including one from Control Technologies, Inc., the Town’s on-call HVAC contractor.

“The proposed improvements would convert the building to ductless split systems providing both heating and cooling, with the intent of taking the existing boiler/furnace out of service,” Dhima explained.

The Town also obtained a separate quote from Brian Mason Electric, LLC, its on-call electrical contractor, for additional electrical work associated with the HVAC installation.

“This work includes disconnecting the old equipment wiring and providing the wiring required for the new systems,” Dhima explained.

The drainage and water-intrusion issues would be addressed through coordinated interior and exterior work involving Town staff and Northpoint.

“The proposed exterior work includes closing the rear entry door opening with concrete masonry and stone infill and removing the failed canopy roof, railing, and existing concrete ramp,” Dhima explained. “Limited grading improvements would direct stormwater toward the parking lot, and a roof-diversion gutter would help manage roof runoff. These improvements would be coordinated with the basement flooring work.”

The individual projects and estimated costs include:
Basement Flooring: Elite Epoxy Flooring would prepare and coat approximately 1,300 square feet of concrete, including repairing surface imperfections. The quote also includes $1,000 for basement access-ramp work, which would be coordinated with the rear-entry improvements.
The estimated cost for the flooring work is $10,100.
Heating and Cooling: The proposed work would involve installing ductless split systems to provide heating and cooling, with the goal of taking the existing boiler and furnace out of service. The estimate uses Extreme Temp’s lowest submitted HVAC quote. Boiler decommissioning would be addressed separately.
The estimated cost is $47,500.
Electrical Work: Brian Mason Electric would disconnect and remove the old equipment wiring and install the wiring needed for the new HVAC systems in surface-mounted conduit.
The estimated cost is $6,750.
Drainage and Rear-Entry Improvements: Town staff and Northpoint would coordinate work to close the rear door opening with concrete masonry and stone infill, remove the failed canopy roof, railing, and existing concrete ramp, make grading improvements to direct water toward the parking lot, and install a roof-diversion gutter.
The estimated cost for this work is between $16,000 and $19,000.

Following the presentation, the Board of Selectmen unanimously approved the proposed Hills Memorial Library improvements, including the basement flooring, conversion to ductless heating and cooling, associated electrical work, and drainage and rear-entry improvements, consistent with the Board’s prior direction to the Town Administrator.

The Board also unanimously approved authorizing the expenditure of up to $75,000 from the Town Buildings Major Repair Capital Reserve Fund, established under Warrant Article 14 on March 11, 2014, for major improvements.

Additionally, the Board authorized awarding the project work to vendors in accordance with the guidelines outlined in Municipal Code Chapter 98, General Purchasing Regulations.